Algeria 75-125mm Three-Layer PPR Pipe Co-Extrusion Line

Technology Empowers Overseas Infrastructure: Yongte's Customized 75-125mm Three-Layer PPR Pipe Extrusion Line Project for the Algerian Client was completed in 2025. 

To meet the needs of Algerian client, Yongte has assembled a dedicated technical team, integrating its R&D expertise in PPR pipe equipment to create a comprehensive solution for 75-125mm three-layer PPR pipe extrusion lines. 

This solution encompasses the entire lifecycle, from equipment R&D and manufacturing to logistics, on-site implementation, and after-sales support:

1. Specification Coverage: This PPR pipe production line stably produce four core diameter PPR pipes: 75mm, 90mm, 110mm, and 125mm, covering multiple scenarios such as municipal main pipelines, industrial water supply, and high-rise building water supply, and supporting rapid diameter switching.

2. Product Performance: The produced PPR pipes comply with local Algerian building material standards (referencing European EN 15874 standards), featuring a three-layer structural design (inner antibacterial layer, middle pressure-bearing layer, outer anti-aging layer) to ensure a service life of ≥50 years.

3. Production Efficiency: Equipped with auto feeder, auto dryer, high effective extrusion machine, high speed vacuum calibration tank and water cooling tank, stably traction and auto cutting equipment, the line features a high degree of automation, reducing reliance on manual labor, with an output of 200 kg/hour.

4. Service Guarantee: Yongte provided full-process services, including on-site installation and commissioning, technical training, and after-sales maintenance to ensure rapid and smooth equipment deployment.

5. Cost Compatibility: The equipment is compatible with local power supplies (380V/50Hz), equipped with a high-efficiency servo motor, featuring low energy consumption and easy maintenance, thereby reducing long-term operating costs.

6. Enhanced Customer Benefits: Automated production has reduced labor costs by 60%, and the low-energy design has saved 20% on electricity bills. The ability to quickly switch between multiple specifications allows customers to flexibly undertake both residential and commercial orders.


Following the successful project implementation, the customer highly praised Yongte's equipment performance and service quality, subsequently placing additional orders to upgrade their existing production line into a high-efficiency, energy-saving system. This collaboration has become a benchmark case for Yongte in the North African market, laying a solid foundation for future business expansion in Algeria and neighboring countries.